in Khartoum Sudan sales price shop near me near me shop factory supplier Ductile Iron Grooved U-Bolted Mechanical Tee with FM UL Ce Approved 300psi for Fire Fighting Pipelines manufacturer best Cost Custom Cheap wholesaler

  in Khartoum Sudan  sales   price   shop   near me   near me shop   factory   supplier Ductile Iron Grooved U-Bolted Mechanical Tee with FM UL Ce Approved 300psi for Fire Fighting Pipelines manufacturer   best   Cost   Custom   Cheap   wholesaler

we are self-assured to supply our consumers flexible and diversified companies. Our AdvantagesProducts Large volume in Inventory, No MOQ necessary We comply with all the global expectations, this sort of as ISO9001 and TS16949 requirements. In addition, all our generation methods are in compliance with ISO9002 specifications.

Solution Description

1 periodProduct basic data

EPT Ductile Iron lparASTM A536 Grade sixty five-forty five-twelve rpar
Gasket EPT EPTDM
Floor Remedy Epoxy- lparRed rparRAL3000 comma Epoxy-Orange comma Epoxy powEPTTpainting commaHot Galvanized comma
Dimensions 1 quot-12 quot
Doing work Force 300PSI
Cerification ISO 9001 colon2008 commaFM commaUL commaCCC and CE authorized
EPT Conclude Variety Grooved stop commaThread conclude
EPTT EPTT
Bolts and Nuts ISO 898-one Class8 period8
Payment by T solT commaL solC
EPTT In poly wood situation commaor in carton on the poly picket pallets commawe can pack goods as for every custmon aposs prerequisite period
Supply depth typically within 15days commadepending on orEPTTquantity time period
Construction kind 1 rpar Rigid Coupling commaFleXiHu (West EPT) Dis.ble Coupling comma Reducing FleXiHu (West EPT) Dis.ble Coupling
two rpar EPTT Radius and Limited Radius Elbow lpar90 deg sol45 deg sol22 period5 deg sol11 period25 deg rpar
three rpar Equivalent Tee comma Grooved Lowering Tee comma Grooved Reduing Tee lparThreaded outlet rpar
four rpar Grooved EPT Tee commaGrooved EPT Cross
5 rpar Equal Cross comma Grooved Decreasing Cross
six rpar Grooved EPTT comma Threaded EPTT
seven rpar Adapter Flange comma Grooved SpEPTT Flange
eight rpar Cap commaEnd Cap

two periodSize and SPec

Nominal EPT Working Gap Dia Dimension mm solin Bolt Size
Measurement O periodD Stress mm solin
in mm PSI solMPa plus1 period6 comma0 sol
plus0 period063 comma0 A B C
1 frac14 times1 sol2 42 period4 times21 period3 three hundred sol2 period07 29 sol1 period14 36 sol1 period42 ninety three sol3 period66 56 period58 sol2 period23 M10 times73
1 frac14 times3 sol4 forty two period4 times26 period9 300 sol2 period07 29 sol1 period14 39 sol1 period54 ninety three sol3 period66 fifty six period58 sol2 period23 M10 times73
one frac14 times1 forty two period4 times33 period7 three hundred sol2 period07 29 sol1 period14 forty three sol1 period69 ninety three sol3 period66 fifty six period58 sol2 period23 M10 times73
1 frac12 times1 sol2 48 period3 times21 period3 300 sol2 period07 29 sol1 period14 36 sol1 period42 93 sol3 period66 56 period58 sol2 period23 M10 times73
one frac12 times3 sol4 48 period3 times26 period9 three hundred sol2 period07 29 sol1 period14 39 sol1 period54 ninety three sol3 period66 56 period58 sol2 period23 M10 times73
one frac12 times1 48 period3 times33 period7 three hundred sol2 period07 29 sol1 period14 43 sol1 period69 ninety three sol3 period66 fifty six period58 sol2 period23 M10 times73
two times1 sol2 60 period3 times21 period3 three hundred sol2 period07 29 sol1 period14 36 sol1 period42 ninety eight sol3 period86 57 period04 sol2 period25 M10 times90
2 times3 sol4 60 period3 times26 period9 300 sol2 period07 29 sol1 period14 39 sol1 period54 ninety eight sol3 period86 fifty seven period04 sol2 period25 M10 times90
2 times1 60 period3 times33 period7 300 sol2 period07 29 sol1 period14 forty three sol1 period69 ninety eight sol3 period86 57 period04 sol2 period25 M10 times90
2 frac12 times1 sol2 seventy three period0 times21 period3 three hundred sol2 period07 29 sol1 period14 36 sol1 period42 113 sol4 period45 fifty seven period69 sol2 period27 M10 times105
two frac12 times3 sol4 73 period0 times26 period9 three hundred sol2 period07 29 sol1 period14 39 sol1 period54 113 sol4 period45 fifty seven period69 sol2 period27 M10 times105
two frac12 times1 73 period0 times33 period7 three hundred sol2 period07 29 sol1 period14 forty three sol1 period69 113 sol4 period45 fifty seven period69 sol2 period27 M10 times105
seventy six period1mm times1 sol2 seventy six period1 times21 period3 three hundred sol2 period07 29 sol1 period14 36 sol1 period69 113 sol4 period45 57 period69 sol2 period27 M10 times105
76 period1mm times3 sol4 seventy six period1 times26 period9 three hundred sol2 period07 29 sol1 period14 39 sol1 period54 113 sol4 period45 57 period69 sol2 period27 M10 times105
76 period1mm times1 seventy six period1 times33 period7 300 sol2 period07 29 sol1 period14 43 sol1 period69 113 sol4 period45 57 period69 sol2 period27 M10 times105

3 periodDiscription

quot1Nuo quot grooved couplings and fittings offer a rigid or fleXiHu (West EPT) Dis.ble pipe link for EPT protection methods with trustworthy seals above a assortment of interior strain situations time period

quot1Nuo quot also provides Quick Pattern EPT by way of 8 quot to satisfy all of your EPT protection wants period of time

Rapid and straightforward installation and durable content development make these time period

quot1Nuo quot couplings and fittings ideal for almost any EPT safety software in each wet and dry systems time period The coupling aposs housing is produced from ductile iron conforming to ASTM-A536 commaGrade sixty five-45-12 period of time They are UL solULC Shown and FM Authorized and selection in measurement from 1 one sol4 quot to twelve quot periodThey are also provided with a pre-lubricated gasket period

Property

EPT colon Ductile solid iron conforming to ASTM A-536 comma Quality sixty five-45-twelve time period
Surface area Complete colon
StXiHu (West EPT) Dis.Hu (West EPT) Dis.rd colon Epoxy powEPTTcoating
Optional colon Galvanized lparZinc Plated comma EPTTG Or Dip painted rpar

Floor EPTT colon Variable hues for option

Bolts and Nuts

Heat taken care of and electro galvanized bolts with oval neck comma and heavy duty hexagon nuts interval

Track head meet to the bodily and chemical requirements of ASTM A-449 and actual physical specifications of ASTM A-183 interval

EPT Gasket

StXiHu (West EPT) Dis.Hu (West EPT) Dis.rd colon Grade Estimate quot EPTDM lparEPTT code colon Eco-friendly stripe rpar
Temperature variety -30 degF to plus230 degF lpar-34 degC to plus110 degC rpar period EPTmmended for chilly and sizzling water service within the specified temperature variety additionally a variety of dilute acids comma oil-totally free air and many chemical services period of time NOT REPTTMMENDED FOR PETROLEUM Services time period

Optional colon Grade quotN quot Nitrile NBR lparEPTT code colon Black stripe rpar
Temperature range -twenty degF to plus180 degF lpar-29 degC to plus82 degC rpar period EPTmmended for petroleum products comma air with oil vapors comma vegetable and EPTral oils inside the specified temperature assortment time period Not suggested for hot h2o services more than plus150 degF lpar plus66 degC rpar or for scorching dry air more than plus140 degF lpar plus60 degC rpar period

Grade quotS quot EPT lparEPTT code colon White stripe rpar

Temperature selection -thirty degF to plus350 degF lpar-34 to plus177 degC rpar period EPTmmended for dry heat comma air with no hydrocarbons to plus350 degF lpar plus177 degC rpar and certain chemical services time period Suit items silicone gaskets are recommended for EPT safety dry programs comma all systems functioning underneath degF lpar-eighteen degC rpar comma in addition dry warmth comma air with no hydrocarbons comma certain chemical providers comma and h2o to plus160 degF lpar71 degC rpar interval

4 periodProduct pic

5 periodProduction and Supply

six periodCertification and other merchandise present

seven periodInstallation Instruction for U-Bolt EPT Tee

one period EPT Planning
Cleanse the gasket sealing floor inside 16mm of the gap and examine the sealing floor visually for problems that may possibly avert proper sealing of the gasket time period Don apost drill the gap on weld line period of time
two interval Eliminate burrs
Eliminate any burrs or slug before installation to shield the gasket and avoid leakage time period
3 period Gasket ampEPT Set up
Insert the gasket into outlet housing appropriately period of time Align outlet housing over the pipe gap generating confident that the locating collar is in the pipe hole interval
four time period Alignment
Connect the U-bolt from the other facet and tighten the nuts time period
five time period Tighten nuts
Alternatively and evenly tighten the nuts to the specified bolt torque interval
6 interval Installation comprehensive
Caution
Correct torquing of bolts is JCEP to obtain specified performance interval
-In excess of torquing the bolts could consequence in hurt to the bolt and solor casting which could outcome in pipe joint separation time period
-UnEPTTTorquing the bolts could result in decrease strain retention capabilities comma lower bend load capabilities comma joint leakage and pipe joint separation period of time EPT joint separation may possibly end result in considerable residence damage and severe harm time period

eight periodGasket

Gasket EPT Temperature Assortment EPTmmendations EPTT
E EPTDM -34 ordmC~ plus110 ordmC
lpar-30~ plus230 ordmC rpar
EPTmmend for hot drinking water comma dilute acid comma oil-free gasoline and other mecmicals lparexcept for hybrocarbon rpar inside the specified temperature range interval Not suggest for petroleum and hydrocarbon interval Environmentally friendly Strip
D NBR -29 ordmC~ plus82 ordmC
lpar-twenty~ plus180 ordmC rpar
EPTmmended for petroleum products comma gas with oil vapors comma EPTral oil and vegetable oil period of time Not advisable for high temperature materials interval Orange Strip
S Silicon EPT -40 ordmC~ plus177 ordmC
lpar-40~ plus350 ordmC rpar
EPTmmended for high temperature and dry air comma and some large temperature chemical substances interval White

9 periodProduction approach

A rough castings of grooved fittings will be processed and produced by electric-furnice smelting commaon-line monitoring and management and automated molding strategies period of time

Application colon As 1 of the most well-liked fittings in EPT fighting techniques comma the grooved pipe fittings are broadly used in EPT combating comma air-conditioning comma drinking water source comma sewage comma cement comma oil ampgas pipeline comma EPT piping and normal piping shipping period JCEP is EPTing all more than the world and winning the appreciations from users at house and overseas period

  in Khartoum Sudan  sales   price   shop   near me   near me shop   factory   supplier Ductile Iron Grooved U-Bolted Mechanical Tee with FM UL Ce Approved 300psi for Fire Fighting Pipelines manufacturer   best   Cost   Custom   Cheap   wholesaler

Tags:

Spline Coupling

As one of spline coupling manufacturers, suppliers and exporters of mechanical products, We offer spline coupling and many other products.

Please contact us for details.

Mail:[email protected]

Manufacturer supplier exporter of spline coupling.

 

Recent Posts